Votre navigateur est obsolète !

Pour une expériencenet et une sécurité optimale, mettez à jour votre navigateur. Mettre à jour maintenant

×

Romain V.

Manufacturing Welding Engineer

Romain V.
Professional Status
Freelancer
Available
About Me
Management of continuous improvement projects, inspection, supervision, industrialization of new products, creation of production lines, documentary review and conformity assessment. Experience in identifying and managing CFSI (Counterfeit, Fraudulent, Suspect, Item).
  • Welding Technologist / Site Manager
    Fabrications for the oil, chemical, nuclear and cement industries
    Forming and welding: HLE steels - Aluminium - Stainless steels - Cladding
    Customers : Technip - Cegelec - Packinox - Air Liquide - Pirson - Polysius - Total
    Kvaerner - Heurtey - CNOOC- CHEVRON - Gaz de France - SAIPEM
    Welding processes: SMAW - GTAW- ESW - SAW - GMAW
    NDT : RT / UT / MT / PT - Laser Tracker
    • Drafting of welding specifications and inspection and test plans (ITP)
    • Welding human resources management (induction qualifications)
    • Non-destructive testing (penetrant testing and magnetic particle inspection) and dimensional testing
    • Planning of subcontracting operations (TOFD-RT-UT-TTH)
    • Reception of surface preparations/coatings
    • Inspections and acceptance of subcontracted equipment (International).
  • Workshop follow-up -CEGELEC : Experimental chamber for the megajoule laser (LMJ CEA) - Aluminium sphere --Thickness 120 mm diameter 10m
    • Technip : HDS reactor for Feyzin - Steel 1.25 Cr clad 347- Thickness 80 mm
      -Packinox: Stainless steel plate heat exchangers - 2.25 Cr steel P420 HT L2 - 55 mm - Diam. 12 m
      Sollac: HF1 shielding for Pirson
    • Eluxyl: Chemical industry internals for Axens
  • Akpo Project - Pressure vessels for Technip to ASME (Total)
    • Daily reporting (customer project manager)
    • Definition and implementation of corrective actions to guarantee deadlines
    • Interface between different production departments-Acceptance and control of subcontracting operations
    • Optimization of production times and costs-Review of documentation
    • Acceptance and control of subcontracting operations-Compilation of manufacturers' files (paper and digital)- Review of documentation- Compilation of manufacturers' files (paper and digital)
  • Site foreman On U. S. Steel Košice (Slovakia)
    • Nitrogen and oxygen storage for Air Liquide
      Double-jacket tanks Carbon steel and stainless steel
    • Manage the team and subcontractors responsible for carrying out the work (10 p.)
    • Contribute to planning and daily monitoring of drifts-Perform hydraulic tests
    • Compile manufacturer's file
    • Subcontract management - Passivation / Perlitage